>
How to install Austral Addaline 33 & Addaline 35 clothes lines
Wall mounted clothesline instructions
Hold one of the brackets to the wall in the position required and at a height approximately equal to the users head height. Ensure that the bracket is vertically level and mark top and bottom drill positions through the slot holes of the bracket. measure 2320mm horizontally from each mark made and mark wall again. drill four holes. Attach both brackets to the wall.
NOTE: Fasteners not supplied. Use type 17, 75mm tech screws, Dynabolts or similar.

How to install Austral addaline 33 & addaline 35 clothesline products.
Step 2
Slide a line tension lock down one of the tubular sections and one down the other tubular sections. 2 different lengthed tubes. Secure tubular sections to the bracket using the top bolt holes of the bracket, 75mm bolt, flat washer, nylon washer and lock nut.
Step 3
Connect brace to the outside of the bracket, using the bottom holes of the bracket, 75mm bolt, flat washer,nylon washer, nylon spacer, inner lock stay and lock nut.
NOTE: The brace has 2 set screws along the length of it-when the clothes line is in the up position the set screw farthest from the bracket faces down/is underneath.
DO NOT TIGHTEN
Step 4
Slide catch for braces down each brace with the bolt hole in each catch on the top side of the brace and to the front.
Step 5
Place the 60mm bolt through the hole in the catch, fit the nylon washer over the bolt. Push the balance of the bolt through the locating hole of the tubular section and fit the locknut.
DO NOT TIGHTEN
This is a gravity catch and brace so catch must move freely.
Step 6
Fit front bars to the tubular sections, using a small mallet hit each to ensure front bars are secure. Tighten all bolts ensuring they are not over tight and that the catches on the brace can move freely.
Step 7
Thread clothes line cord starting at the hole nearest to the bracket on the tubular section with the line tension lock. before the cord goes through the last hole, fit the cord tidy to the line and then push through hole. tie cord around frame of last hole cut as required and push cut end back through the cord tidy.
One length at a time pull the cord taut working from back to front , thread through the line tension lock and lock down. Cut line with approx 6 inches to spare, fit cord knob and tie a knot in cord and pull cord knob over knot. carry out same procedure for the other frame. Fit the plastic caps to braces and tube sections.
Step 1
Step 2
Step 3
Select site and dig two holes 2360mm or 2400mm for the new larger Addaline 35, apart centre to centre.( some fold downs have a shorter width. Just measure your leg kit tie bar to find the distance needed). The holes should be 300mm in diameter and 500mm deep.
After assembling the clothes line as a wall mount. Lay the rear tie bar flat on the ground. Place each leg flat on the ground at the ends of the rear tie bar and bolt the wall mount to the legs and rear tie bar using 6mm x 80mm bplts, washer & nut through the top hole of the wall bracket. top hole of leg and the tie bar. Use the 6mm x 60mm bolt, washer &nut through the bottom slot of the wall mount bracket and leg.
Fit all the plastic ends to legs and brace. Position clothes line legs in the pre dug holes at a height such that the top pivot bolt is at users head height. Add dry mix of concrete.( e.g. 4 gravel, 2 sand, 1 cement) Ensure the legs are perpendicular and add a bucket of water. Leave clothes line in folded position for 48 hrs before using.

© 2007-2008 QCL Australia
Austral addaline 33 instructions 1 Austral addaline 33 instructions 3 Austral addaline 33 instructions 2
The updated Austral addaline 33 now called addaline 35, now come partially assembled. Go to bottom of page for these instructions.
Important:
Instructions updated on 11.11.07
Ground mounted clothesline instructions
Partially assembled models.
Step 1
Hold one of the wall brackets to the wall in the position required and at a height approximately equal to the users head height. Ensure the bracket is vertically level and mark the top and bottom and drill positions through the slot holes of the bracket. Measure 2400mm horizontally from each mark made and mark wall again. Drill four holes. Attach both brackets to the wall. With these updated models the brackets now come with the arm assembly fully assembled. So when you attach the bracket, attach the whole assembly with it.
Step 2
Fit both front bars to the tubular sections and make sure each side is fitted fully in as far as they go.
Step 6
Thread the clothes line cord starting at the hole nearest the bracket on the tubular section with the line tension lock. Before the line goes through the last hole, fit the cord tidy to the line and then push through the hole. Tie cord over the top of the frame at the last hole, cut as required and push cut end back through the cord tidy. One length at a time pull cord taut working from back to front, thread through the line tension lock and lock down. Cut the line with approx 6 inches to spare, fit cord knob, tie a knot  in cord and pull knob down over the knot. Fit plastic caps.
Austral addaline 33 instructions 5 Austral addaline 33 instructions 4
How to install Austral Addaline 33-35 clothes lines.
Quality endorsed company
Austral
You are on the  Austral Addaline installation page.
Step 1